Pennsylvania Limestone Farmhouse Renovations to an 1863 farmhouse built of limestone

September 5, 2010

Recent Breaks

Filed under: Interior,trim — Duane Diefenbach @ 8:31 pm

This week ended with a break in the seeming unrelenting hot weather and we are now experiencing highs in the 70s and lows in the 40s. The other break was my right forearm.

It’s now in a cast for about 6 weeks. Wednesday night I was climbing into the barn attic to adjust the yard light timer when the ladder slipped out from under me and I fell and broke my radius. I didn’t go to the emergency room until Thursday morning because the pain wasn’t that bad but it’s broken (no surgery necessary).

That slowed down tiling the master bathroom and powder room, but the tiles are installed.

This was accomplished with a good bit of help from Lisa, Molly, and Ethan.  Molly had to carry out a 50 lb bag of thinset from the hardware store while I carried out a small bag of other items!

Powered by WordPress