Pennsylvania Limestone Farmhouse Renovations to an 1863 farmhouse built of limestone

April 13, 2014

A Digression… Finish Carpentry

Filed under: Dining Room,Living room,Stone house restoration,Uncategorized — Duane Diefenbach @ 8:42 pm

One of the things that has slowed my progress on this house has been moving from modern power tools to the hand tools that were likely used on our home. Because of this “disease” of mine I decided to do the finish carpentry in the downstairs rooms with hand tools. This post shows what I did and maybe (partially?) explains why it took so long!  😉

This window used to be a door… from the old kitchen to the basement. Soon it will be a window again. However, the finish carpentry first required that a stool be constructed that was about 18″ deep and 42″ wide.  Then side casing was added, then head casing across the top, and finally an apron underneath completed the woodwork.

OLYMPUS DIGITAL CAMERA

 

To make the stool I started with a piece of white pine about 22″ wide and 45″ long. I planed the board using hand planes. First a #5 Stanley to remove the coarsest imperfections and I finished with a #8 Stanley to smooth the surface. The underside was left unfinished.

OLYMPUS DIGITAL CAMERA  OLYMPUS DIGITAL CAMERA

 

Then a rabbet was needed to fit into the window frame so that notches in the stiles of the frame allowed the stool to nicely meet the lower sash.  To make the rabbet I used a rebate plane that I bought on eBay and restored.

OLYMPUS DIGITAL CAMERA

I then cut the stool (using crosscut and rip saws) to fit the window so that the distance from the sash to the “wings” on each side (that will be underneath each side casing) was correct.

OLYMPUS DIGITAL CAMERA

 

This is how the stool fit at this point.

OLYMPUS DIGITAL CAMERA

 

Once the stool was fit to the sash then I could finish the “wings” to length and depth (with respect to the side casing).

OLYMPUS DIGITAL CAMERA

Fitting the side casing at this point was relatively simple. The side casing is nailed to wooden blocks installed in the stonework as well as nails that come up from underneath the stool.

OLYMPUS DIGITAL CAMERA

 

The next step was to install the head casing. To hide any imperfections (and later movement of the wood, or house), the carpenters for our home cut a rabbet in the head casing to join the side and head casings. See photo below. I used a different approach to hide imperfections in matching side and head casings in the new part of the house (see this post).

 

OLYMPUS DIGITAL CAMERA

So here’s the window with stool, side casing, and head casing installed.

OLYMPUS DIGITAL CAMERA

 

The final carpentry required is to install the apron, which is nailed to the two blocks that support the stool.

OLYMPUS DIGITAL CAMERA

 

Now “all” that’s left is for the plasterers to finish the wall! (and that would be me)

The Final Push…

Filed under: Dining Room,Living room,Stone house restoration,Upstairs — Duane Diefenbach @ 5:11 pm

…to get the major work completed on the old part of the house!  Sorry there has been such a hiatus but the 2012-2013 hunting seasons stopped work (on the house) for a while as well as other things like this small end table for PASA to auction at their annual meeting.

OLYMPUS DIGITAL CAMERA

And then there was the issue of overcoming inertia in tackling the plaster work downstairs.

So here are some pics of the upstairs. Work is complete except for:

  1. Doors for 3 closets
  2. Trim and final paint around all window sashes
  3. Shelves and racks in the closets
  4. Two storm windows

So really not that much left to do!  😉

Here is a photo of me sanding the floor. Fortunately, most of it was bare wood but all the areas near the walls had some paint – either intentional coats or drips from paint jobs.

OLYMPUS DIGITAL CAMERA

Sanding is a miserable, dusty, backbreaking, knee-stiffening job. But the results are worth it. The patina from 150 years of abuse makes the floors look beautiful especially with all the dents, scratches, nails, stains, etc.

OLYMPUS DIGITAL CAMERA

Currently, what will be our guest bedroom is serving as a living room. It looks like this:

OLYMPUS DIGITAL CAMERA

 

And the office could be another guest room!

OLYMPUS DIGITAL CAMERA

 

So the next major task(s) to complete is the downstairs (including the stairs) of what will be the dining room and living room. In the future living room I had to finish plastering around two windows because the one on the right used to be a doorway to the kitchen, and the one on the left used to be a doorway to the basement. Also, the ductwork for the upstairs had to be enclosed. The ceiling and floor in that corner of the room used to be a stairway (see the posts for July 2013). If you look closely, the wall between the ductwork and window is partially original plaster and joint compound. This is the only place where I took the time and effort (and expense, hot mud is expensive) to repair the last plaster – mostly because I wanted to see if I could do it.  I can but it was not easy.

OLYMPUS DIGITAL CAMERA  OLYMPUS DIGITAL CAMERA

The chase for the ductwork will also provide for another run for the central vac! (see photo)

OLYMPUS DIGITAL CAMERA

 

The dining room required sheetrock along one wall to replace lath and plaster beyond repair, restoration of baseboards, repairs to window trim and door trim, and finishing trim on the doorway to the basement and upstairs. Here are some photos of what had to be, or what was, done:

OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA  OLYMPUS DIGITAL CAMERA

After all the finish carpentry was completed I had to joint compound everything – finish sheetrock joints, fill major gaps/holes in damaged plaster, and skimcoat all the plaster in both room. That was really mental block and the major reason for the delay in progress.

So this post really updates everything that has (or has not) happened since last September. In the next post I’ll document how the finish work is going.

 

 

 

Powered by WordPress