Pennsylvania Limestone Farmhouse Renovations to an 1863 farmhouse built of limestone

July 30, 2013

Lots of Work Ahead

Filed under: Stone house restoration,Upstairs — Duane Diefenbach @ 9:02 pm

It seems like most of the renovation recently has been coming to the realization that more plaster has to be removed from the walls or ceiling.  And that I need more drywall to replace the lath and plaster. As a result, Molly was intruded one early morning (no earlier than 8am) with drywall transport through her room.

drywall

 

This is because our old bedroom wall had to have all the plaster removed (see earlier post where I tried to save some).

OLYMPUS DIGITAL CAMERA  OLYMPUS DIGITAL CAMERA

 

Here are a bunch of photos of what the upstairs looks like now as we install drywall, restore trim around doors and windows, strip paint, and prime trim.

OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERAOLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERAOLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERAOLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA

 

No Comments »

No comments yet.

RSS feed for comments on this post. TrackBack URL

Leave a comment

Time limit is exhausted. Please reload the CAPTCHA.

Powered by WordPress